Authors: Václav Votava, Zdenek Ulrych, Milan Edl, Michal Korecký, Václav Trkovský
This paper focuses on simulation study of small-lot production of complicated products with a long technological time. The paper describes a possible procedure for generating simulation models based on incomplete data from EIS. This simulation model must flexibly react to changes in complicated technological steps. This paper describes one possible solution to this problem.