Authors: A. Lamas-Rodríguez, D. Crespo-Pereira, R. Sánchez-Tutor
Certain measures for optimization of jacket offshore structures manufacturing are presented in this paper. By using Discrete Events Simulation, various simulation models will be developed in order to reduce flowtime per jacket, identify bottlenecks, adjust manufacturing time to due dates and minimize probability of breaking them. This simulation model will be referred to a company with limited resources involving space and work-stations.