MAS 2017 Proceeding

Simulation-based optimization of a four stage hybrid flow shop with sequence-dependent setup times and availability constraints

Authors:   P. Aurich, A. Nahhas, T. Reggelin, M. Krist

Abstract

I3M  Scientific Sponsors

I3M  Industrial Sponsors

I3M  Media Sponsors